Ospedale SAN RAFFAELE (2)

NOTE! This site uses cookies and similar technologies.

If you not change browser settings, you agree to it.

I understand

The restructuring of the Civil Hospital Guastalla - USL of Reggio Emilia includes the construction of facilities of the Laboratory analysis of 4 floors of hospitalization and emergency room.

Specifically it is the Water Plant Health, Plant collection and disposal of waste water, Water Plant in Fire Hydrants, Air Conditioning system, Ventilation system, BMS supervision systems

 

Design specifications

 

Order:   Guastalla Hospital Extension
Customer:   Unieco
Place:   Guastalla
Completion date:   2016

 

 

The new hospital in Garbagnate Milanese is inserted within an area of about 130,000 square metres, next to the old hospital, within the district of the Regional Park of the Groane. A 536-bed facility structure which will cover a total area of 57,000 square metres, which will contain all the activities of the former seat, supplemented by rehabilitative specialists. The building is on three levels above ground, plus another one for plant technologies. The volume appears to be structured according to a distribution center axis oriented to the east-west of the building on which, on one hand it is inserted the "comb" generated by the three bodies that will host the wards, while the other one develops the plate, inside which will be placed large patios to ensure the lighting and ventilation of all the indoor environments.

 

DETAILS OF THE PROJECT

 

Order:   Ospedale Garbagnate Salute
Client:   GARBAGNATE SALUTE SCARL
Place:   Garbagnate Milanese (MI)
Completion date:   In progress

 

PHOTO gallery

 

 

project details

 

Order:   Villa Elios c/o Gavazzeni Hospital
Client:   REALE MUTUA ASSICURAZIONI
Place:   Bergamo
Year:   2003
    Conditioning Plants - water and sanitary system and fire protection for Cardiac Surgery School within the hospital complex

 

project details

 

Order:   Health Care Residential Via Ippocrate
Client:   A.APOLLONIO SpA
Place:   Via Ippocrate - Milano
Year:   2004
   

Conditioning systems - water and sanitary system and fire protection

Total area mq 17,800

 

project details

 

Order:   S.Raffale Hospital
Client:   DEC
Place:   Milano
Year:   2007
    Conditioning systems - water and sanitary system and fire protection

ars biomedica roma

The building and 'consists of a main building, consists of 6 levels above ground (from the ground to the 5' level), a basement level and a basement level. The levels above ground are used as nursing home, while the basement levels are medical offices, clinics and operating theaters.i. 

 

DETAILS OF THE PROJECT

 

Order:   ARS Biomedica
Client:   Impresa Ricci S.p.A
Place:   Via L.Bodio - Roma
Completion date:   Previsto Mese di Settembre 2015

 

 

  Completed in 2025
Order:   Padiglione B - P.zza Cardinal Ferrari –Mi
Client:   ASST Gaetano Pini
Place:   Milano
Completed in 2022
Order:   Ristrutturazione Ospedale S. Gerardo (Fasi 2-3-4)
Client:   Sange.co
Place:   Monza
Completed in 2018
Order:   Ristrutturazione Edificio Via Appiani Monza
Client:   Istituti Clinici Zucchi S.p.A
Place:   Monza
Completed in 2016
Order:   Guastalla Hospital Extension
Client:   Unieco
Place:   Guastalla
Completed in 2015
Order:   New Hospital G.Salvini Garbagnate
Client:   Garbagnatesalutecostruzione
Place:   Garbagnate Milanese (Mi)
Completed in 2007
Order:   S.Raffaele Hospital
Client:   DEC
Place:   Milano
Completed in 2004
Order:   Health Care Residential Via Ippocrate
Client:   A.POLLONIO
Place   Via Ippocrate - Milano
Completed in 2003
Order:   Villa Elios c/o Gavazzeni Hospital
Client:   REALE MUTUA ASSICURAZIONI
Place:   Bergamo