Project specifications
| Order: | Hotel Via Senato 5 – Milano |
|
| Client: | Co.ge.fa spa | |
| Place: | Milano | |
| Completion date: | 2025 |

The building stands in the historical center of Turin, in the block of San Bartolomeo in Piazza Carlo Emanuele II. The building renovation works will allow the change of use destination from residential to hospitality. The gross floor area of the building is approximately 10,800 square metres, plus service areas and an underground car park that will develop under the courtyard. On the ground floor and basement are provided the main hotel services such as reception, bar, restaurant, conference facilities, shops facing the commercial Via Maria Vittoria. The system is made with cooled heat pumps with well water and recovery for domestic hot water.
DETAILS OF THE PROJECT
| Order: | Hotel Carlina P.zza Carlo Emanuele | |
| Client: | CARLINA Srl | |
| Place: | Torino | |
| Completion date: | In progress |
photo gallery
https://www.gflonghi.it/en/hotel-carlina-torino/43-alberghiero.html#sigProIde0215ba791

Construction of a new receptive structure with 340 rooms, conference rooms, offices and spas.
The hot water for the space heating that are served by hydronic system, will not be produced directly on site but we will use the heat from a district heating plant which, through a heat exchanger, will transfer the needed heat energy to satisfy the technological systems to the benefit of the building.
details of the project
| Order: | Hotel M1 Mezzocammino | |
| Client: | PESSINA COSTRUZIONI SpA | |
| Place: | Roma | |
| Completion data: | In progress |
photo gallery
https://www.gflonghi.it/en/hotel-carlina-torino/43-alberghiero.html#sigProId2ce0fbad40

The suspended tower in Sesto San Giovanni looks like an icon that shows the new identity of what has been one of the largest industrial cities in Europe. The restoration of the building is an outcome of the architect Baldo Battaglia who converted the 13-storey architectural charm building, made of glass and steel, into a 191 rooms hotel of the chain B & B.
details of the project
| Order: | Hotel B&B Torre Sospesa | |
| Client: | CIVIDINI ING E CO. | |
| Place: | Sesto San Giovanni (MI) | |
| Completion date: | In progress |

project details
| Order: | Baglioni Hotel | |
| Client: | REALE MUTUA ASSICURAZIONI | |
| Place: | Via Senato - Milano | |
| Year: | 2002 | |
|
Air conditioning - water and sanitary system - fire hydrants Nr. 38 Suite |
project details
| Order: | San Biagio Hotel | |
| Client: | COOPSETTE SOC. COOP. | |
| Place: | Bolzaneto (GE) | |
| Year: | 2003 | |
| Air conditioning - water and sanitary system - fire hydrants Total area mq 7,900 |

project details
| Order: | Albergo Hotel NH S.Stefano | |
| Client: | DEGA | |
| Place: | Torino | |
| Year: | 2005 | |
|
Air conditioning - water and sanitary system - fire hydrants Total area mq 5,700 |

project details
| Order: | Albergo Hotel Domina | |
| Client: | IMPRESA MARCORA | |
| Place: | Novate (Mi) | |
| Year: | 2007 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers Total area mq 8,600 and car parking mq 3,600 |

project details
| Order: | Hotel BENTLEY (5 stelle) | |
| Client: | COOPSETTE SOC.COOP. | |
| Place: | Genova | |
| Year: | 2007 | |
|
Air conditioning - water and sanitary system - fire hydrants Total area mq 4,800 Total treated air mc/h 52,000 Total cooling power kw 570v Total thermal power kw 720 |
project details
| Order: | Novotel Hotel | |
| Client: | ITALCANTIERI | |
| Place: | Cardano al Campo (Va) | |
| Year: | 2007 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers Nr. 208 Hotel rooms Total treated air mc/h 78,000 Total cooling power kw 840 Total thermal power kw 780 Covered car parking mq 7,000 |

project details
| Order: | NH Hotel, Fiera Milano | |
| Client: | C.M.B. | |
| Place: | Rho-Pero (Mi) | |
| Year: | 2008 | |
|
Air conditioning - water and sanitary system - fire protection Total area mq 23,388 Nr. 398 Hotel rooms Total cooling power kw 1,804 Total thermal power kw 3,966 Total treated air mc/h 139,100 |

project details
| Order: | Albergo Hotel Holiday Inn |
|
| Client: | COOPERATIVA CESI | |
| Place: | Roma | |
| Year: | 2009 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers Nr. 300 Hotel rooms Total treated air mc / h 112,000 Total cooling power kw 1,200 Total thermal power kw 1,340 |
