| CLIENT | DESCRIPTION | SITE |
| Milano Assicurazioni spa | Air conditioning, plumbing, fire prevention and various technological systems | Office Building - Assago (MI) |
| La Fondiaria Assic. spa | Air conditioning, plumbing, fire prevention systems | Office Building, Corso Matteotti - Florence |
| Soc. ACCIAIERIE ALPA | Air conditioning, heating, and plumbing systems | New Offices - Gangerville (France) |
| S.I.P. | Air conditioning, heating, plumbing, and fire prevention systems | Piazza Piccapietra - Genoa |
| Banca San Paolo | Air conditioning, heating, plumbing, and fire prevention systems | Rivarolo Branch - Genoa |
| S.N.A.M. spa | Air conditioning, heating, plumbing, and fire prevention systems | Two office buildings in Piazza Santa Barbara - San Donato (MI) |
| Aerimpianti spa | Air conditioning, plumbing, fire prevention and various technological systems | New Courthouse - Turin |
| Milano Termica spa | Air conditioning, plumbing, fire prevention and various technological systems | Twin Towers - Genoa |
| With CAPUA Consortial Company A.R.L. Ravenna | Heating plant, water system, substations and fluid distribution in tunnels | New Prison Facility - S. Maria Capua Vetere (CE) |
| AERMARELLI spa | Heating, plumbing, fire prevention and various technological systems | I.B.M. - Segrate (MI) |
| TOTAL TERMICA spa | Air conditioning, heating, and various technological systems | University of Tor Vergata - Rome |
| Ingg. Grossi & Speier spa | Air conditioning and heating systems | ITALCABLE - Cassina de’ Pecchi (MI) |
Project specifications
| Order: | Edifici Torre C e D Villaggio Olimpico – Mi |
|
| Client: | Milani Giovanni spa | |
| Place: | Milano | |
| Completion date: | 2025 |

Project specifications
| Order: | Edifici Corso Porta Nuova 19 – Milano |
|
| Client: | Co.ge.fa spa | |
| Place: | Milano | |
| Completion date: | 2025 |

Project specifications
| Order: | Edificio Via Pirelli 35 M |
|
| Client: | CARRON CAV. ANGELO Spa | |
| Place: | Milano | |
| Completion date: | 2023 |



project details
| Order: | Palazzo Uffici Edificio area Ex Cantoni | |
| Client: | GDM COSTRUZIONI | |
| Place: | Legnano (Mi) | |
| Year: | 2009 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers Total area mq 11,500 Total treated air mc / h 71,000 Total cooling power kw 1,400 Total thermal power kw 1,300 Total cover car parking area mq 44,000 |
View the embedded image gallery online at:
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProId851b46641d
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProId851b46641d
PROJECT DETAILS
| Order: | Multi-storey Energy Park Parking | |
| Client: | CESI | |
| Place: | Vimercate (MB) | |
| Year: | 2010 | |
|
Automatic extinguishing system - fire hydrant system Total area mq 33,540 Nr. 6 parking floors including 2 basement parkings Nr. 12 dry pipe systems |

project details
| Order: | B04 Energy Park Office Building | |
| Client: | CESI SOC. COOP | |
| Place: | Vimercate (MB) | |
| Year: |
2012 |
gallery
View the embedded image gallery online at:
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProId87f66ee54c
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProId87f66ee54c

project details
| Order: | Multilevel Parking | |
| Client: | COOPSETTE SOC.COOP. | |
| Place: | Sestri Ponente (GE) | |
| Year: | 2012 | |
|
Automatic extinguishing system - fire hydrant system - car parking ventilation system Total area mq 3,400 |

project details
| Order: | Palazzo Uffici Edificio Tenova | |
| Client: | COOPSETTE SOC.COOP. | |
| Place: | Sestri Ponente (Genova) | |
| Year: | 2011 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers Total area mq 6,000 Total trated air mc/h 32,000 Total cooling power kw 660 Total thermal power kw 360 Nr. 260 four-pipes chilled beams |
gallery
View the embedded image gallery online at:
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProIde16944bd96
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProIde16944bd96
project details
| Order: | Centro Polifunzionale Piazza SANTA GILLA | |
| Client: | IMMOBILIARE EUROPEA | |
| Place: | Cagliari | |
| Year: | 2010 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers only in the underground car parks and commercial areas . Unione Sarda Offices Building Nr. 4 buildings for residential and managerial use Nr. 2 buildings for managerial and commercial use Nr. 1 Multiplex Cinema with nr. 5 movie theatres Nr. 2 underground car park floors |
gallery
https://www.gflonghi.it/en/activities/direzionale/directional-buildings-from-2001-to-2025/42-direzionale.html#sigProId5c976bd2a8

project details
| Order: | Palazzo Uffici Edificio B03 Energy Park | |
| Client: | CESI SOC. COOP | |
| Place: | Vimercate (MB) | |
| Year: | 2012 | |
|
Air conditioning with well water condensed multi-purpose groups water and sanitary system - fire hydrants Total area mq. 18,500 Total treated air mc / h 76,000 Total cooling power kw 1,280 |

project details
| Order: | ABB Office Building | |
| Client: | COOPSETTE SOC.COOP. | |
| Place: | Sestri ponente (GE) | |
| Year: | 2010 | |
|
Air conditioning - water and sanitary system - fire hydrants and sprinklers Total area mq 9,600 Total cooling power kw 1,740 Total thermal power kw 1,260 Nr. 420 four-pipes fan coil |